Egypt

The Minister of Transport is inspecting the work of the first line of rapid electric train in Al -Amiriya and Burj Al Arab

Deputy Prime Minister for Industrial Development, Minister of Industry and Transport, Eng. Kamel Al -Wazir, inspected the work sites in the first line of the fast electric train network & quot; Al -Sukhna/ Al -Alamein/ Matrouh & quot;, which is 660 km long, and is included in the logistical corridor & quot; Sokhna/ Dekheila & quot; Until Matrouh. For the project. Facilitating the movement of their various movements to and from Alexandria and achieving traffic liquidity in this region. Rocks. Business, and the timeline of the works being implemented. The first disero that was manufactured in the German Siemens factories and was supplied to Egypt several months ago, where the fully completed manufacture of five fast trains (Villaro) out of a total of 15 fast trains allocated to the line, and the manufacture of eight regional trains (Desiro) has been completed, out of a total of 34 regional trains allocated to the line, in addition to the completion of the manufacture of 5 electric tractors For goods from a total of 14 tractor goods. From Burj Al Arab to the coast, Alamein, and vice versa, to serve the industrial areas in Burj Al Arab and the movement of goods, and increase security and safety rates on roads to cross the railway line and the top of the fast electric train. & Nbsp; & nbsp;

Related Articles

Back to top button

Discover more from Khaleejion 24

Subscribe now to keep reading and get access to the full archive.

Continue reading