Gulf News

المملكة: Electronic tracking and safety plans … new controls to get rid of demolition and construction waste


The National Waste Management Center launched « Moan , “via a” poll “platform, draft controls and technical evidence for the Department of Building and Demolition Wastes, calling on the relevant authorities, specialists and interested to participate in their opinions and observations before they are permanently approved." target ="_Blank"> Environmental performance and the economic of the sector, by setting the minimum requirements and standards for the activities to dispose of these waste. Safe.

strict standards of disposal sites

The system’s executive regulations are detailed, as they set strict criteria for the design of the final disposal sites, in a way that ensures the protection of soil and groundwater through geological barriers and advanced systems to collect and treat colds and gases. With accurate procedures, they start from calculating the estimated quantities of waste through the “Baladi” platform, and contracting with an accredited carrier, to documenting the waste path until the designated fold, which guarantees the highest levels of control and transparency. To oversee the stages of construction, verify the matching materials to international standards such as ASTM and ISO, and documenting all procedures in a detailed report submitted to the center.

Operating control


The oversight does not stop at the end of the construction, as it extends to the operating stage through integrated health, safety and environment plans «HSE), aimed at protecting workers and surrounding society. These plans include managing health risks for dangerous materials, providing personal protection equipment for workers, organizing traffic within the site, developing programs to prepare for emergency. The competent, to ensure the achievement of sustainable development and environmental protection as a national priority.

Related Articles

Back to top button