“AMAC”: Resuming operation of the basic metals processing plant after a 16-week hiatus

The Great Factories Mining Company (AMAC) announced the resumption of operation of the Masaniya factory for processing basic metals (zinc and copper concentrates) as of today, after a temporary suspension period that lasted for 16 weeks.
The company said in a statement on its website "Saudi Arabia trading"This measure is consistent with its business plan for the year 2026, which aims to improve and maximize the long-term benefit from the ore production from the (Sada, Hoora, and Ma’id) reservoirs, which collectively represent the underground mining mine in the Masnaa Factory for basic and precious metals.
It expected that the resumption of operation would contribute to enhancing the efficiency of operational processes and stabilizing production levels during the coming period – God willing -.
The Great Masnaa Mining Company was (AMAC) announced on 08/03/1447, corresponding to 01/22/2026 AD, the temporary suspension of the processing of basic metals (for zinc and copper concentrates) through the factories for processing, for a period of approximately 16 weeks, starting from January 22, 2026 AD.
It stated that the financial impact associated with the period of suspension and resumption of operations will depend on the average selling prices of metals during the relevant period, provided that this impact is reflected in the financial results. For the second quarter of 2026.
- For more: Follow Khaleejion 24 Arabic, Khaleejion 24 English, Khaleejion 24 Live, and for social media follow us on Facebook and Twitter




