Sharjah Electricity operates the electricity and water networks in Al-Muhtadi neighborhood

Sharjah, February 21 / WAM / The Sharjah Electricity, Water and Gas Authority has completed the operation of the electricity and water distribution networks and service delivery for the Al-Muhtadi neighborhood residential complex, phase three, in the Wadi Al-Hilu area. It has also provided a specialized team to register service accounts in the names of the beneficiaries during the celebration of handing over the keys, as part of the authority’s keenness to provide high-quality services in all regions of the emirate.
Engineer Youssef Al Hammadi, Director of the Kalba Department at the Sharjah Electricity, Water and Gas Authority, explained that the authority is keen to strengthen the electrical infrastructure and provide sustainable electrical services that support the needs of residents and future projects, in accordance with the highest standards of quality and safety.
He pointed out that the electricity distribution network project in the Al-Muhtadi neighborhood in the Wadi Al-Helu region included the establishment of an 11 KV electricity distribution station, the installation of 5 electricity distribution boxes, and the extension of medium pressure cables, one kilometer long, and low pressure cables, one kilometer long.
He added that the water network project for the residential complex of the New Al-Muhtadi neighborhood in Wadi Al-Helu has been completed. It is being implemented according to the best specifications and using GRE pipes, which are considered one of the best types. Electricity and water meters have been installed and operated for all residences in the Al-Muhtadi neighborhood.
- For more: Follow Khaleejion 24 Arabic, Khaleejion 24 English, Khaleejion 24 Live, and for social media follow us on Facebook and Twitter



