Egypt

The Minister of Housing: The second stage is partially operating and entering the service from the New Cairo Water Station

& nbsp; The Minister of Housing, Utilities and Urban Communities, Eng. Sherif El -Sherbiny, announced the start of the second stage partial and entering the service from the drinking water purification plant in New Cairo City, bringing the total current production capacity of the station to 600 thousand m3/day, pointing out that when the operating of the first and second stages of the station will produce one million m3/days of water Pure. Al -Ghaiti, Head of the New Cairo City Development Authority, accompanied by Eng. Mohamed Mohy, Vice -President of the Authority for the Stations Sector, and the officials of the agency, operating work and follow -up of the readiness of various components within the second stage of the city’s drinking water purification plant.

& nbsp; For specifications, he also directed the need to raise drinking water samples periodically to ensure quality, with full coordination with the Ministry of Health to conduct the necessary chemical, bacteriological and biological analyzes. In succession to meet the needs of the city and keep pace with the accelerated population and urban increase.

Related Articles

Back to top button