Egypt

"Insulted" Looking for the localization of the systems, equipment and electrical tasks industry

In the context of the assignments of President Abdel Fattah El -Sisi, to support and localize the industry and transfer modern technology, replace the local product and increase the percentage of local components identical to international standards and specifications in various projects, Dr. Mahmoud Esmat, Minister of Electricity and Renewable Energy, met with Engineer Alexei Konuninko, Vice President of Atom Stroe Exports, director of the project to establish the Dabaa nuclear station and his accompanying delegation, in the presence of Dr. Sherif Helmy Chairman of the Nuclear Stations Authority, Dr. Ahmed Farghal, head of the executive body to supervise nuclear projects, and a number of those in charge of the project from the Egyptian and Russian sides, to discuss ways to support cooperation, coordination and joint work to increase the percentage of the local component in joint projects, and the transfer and localization of some industries feeding the projects of nuclear stations to generate electricity, which are being implemented in many countries in the East region The middle. The reactor, which is one of the most important technical and engineering components in the implementation path & nbsp; The strategic national project, as well as the local manufacturing of some of the main components, on top of which are the links for the cooling system that is fully produced locally, and continuing to work to enhance local participation, through effective participation of Egyptian workers, which represents about 80% of the total workforce, and the meeting discussed ways of cooperation with many parties such as the Arab Organization for Industrialization within the framework of the plan to localize industry and expand the production of electrical tasks Locally. The fields of internal and external training, and taking the necessary measures, within the framework of permanent and continuous coordination between the Egyptian and Russian sides and close cooperation between field work teams, & nbsp; The meeting touched on the review and requirements of business development in the context of joint commitment and continuous coordination between the participating parties, and to emphasize the end of the strategic project work in accordance with the scheme and the specified time schedules, and the ongoing preparations for the installation of the turbocharged generator for the first nuclear unit that the Dabaa station receives before the end of this year. Technology and localization of the systems, equipment and electrical tasks in the framework of the peaceful Egyptian program for nuclear energy uses in the generation of electricity, stressing the presence of many entities in Egypt qualified and has the ability to participate in this field, pointing to the partnership, cooperation and continuous coordination with the Russian side, explaining that the course of implementing the nuclear plant in Dabaa is going according to what is planned, and there is continuous follow -up and commitment from all parties based on the project in Egypt and Russia as well International companies with the timetable for completing the business and the time specified to finish the various stages and linking the network, pointing to the special importance of the project of the nuclear plant in Daba within the framework of the peaceful Egyptian nuclear program for electricity generation, the energy strategy and the electricity sector work plan that is based on the energy mix and diversifying the sources of electricity generation and relying on new and renewable and clean energies and reducing fuel consumption.

Related Articles

Back to top button