Egypt

Minister of Transport: Damietta Port receives 5 giant parallels for the container station "Long live Egypt 1"

Eng. Kamel Al -Wazir, Deputy Prime Minister for Industrial Development, Minister of Industry and Transport, said today, Friday, that Damietta Port received the ship & quot; Zhen Hua 33 & quot; Coming from China, with 5 giant pavements from the cranes & quot; sts & quot; Devoted to work on the sidewalks of the container station, Long live Egypt 1, in the context of completing the work of the superstructure carried out by the company & quot; Damietta Alias ​​& quot; The operator of the station, in preparation for the proximity of the opening and operation. STS is one of the latest models produced by the leading Chinese company HHMC in the manufacture of modern ports equipment. High, as the outer arm of the winch is 72 meters, which enables it to deal with the largest width of container ships, which enhances the port’s ability to receive the latest types of container ships globally. Protection systems to ensure the safety of discharge and download operations, in addition to their support for integration with smart port management systems, enabling to follow instantaneous operations and achieve the highest levels of efficiency and coordination between the various operating departments inside the station. & quot; rtg & quot; Out of 40 scheduled to be supplied successively, adding that these cranes are of environmentally friendly technologies, ensuring the operation of the station at the highest levels of efficiency and sustainability, as the square cranes are characterized by high operating capabilities, as it is 21 meters high and supports work with a dual system that allows electricity or diesel, in a way that enhances the flexibility and efficiency of operation in various circumstances, as it was manufactured by a company & quot; Genma-kalmar & quot; Chinese, one of the world leading companies in the manufacture of advanced handling equipment. Long live Egypt 1 & quot; One of the largest national projects currently being implemented in Damietta Port, with a 1970 -meter -long stretching length and a depth of 18 meters, and also includes a background with an area of ​​about 922 thousand square meters, with a capacity of 3.5 million rewards. German, Italian Kunschip, and global navigational line, Habaj Lloyd, where it works according to the latest international standards, which enhances the position of the port as an integrated logistical center in the region.

& nbsp; For the directives of President Abdel Fattah Al -Sisi, President of the Republic, in light of the implementation of the integrated logistical corridor & quot; Tanta & ndash; Mansoura & ndash; Damietta & quot, which contributes to supporting the national economy, enhancing the position of Egyptian ports globally by increasing the efficiency of operation, reducing waiting time, and improving the competitiveness to receive new generations of giant ships.

Related Articles

Back to top button