Egypt
The Governor of Giza inspects the field work to repair the sudden break in the water line on Rabei Al-Jizi Street

Engineer Adel Al-Najjar, Governor of Giza, inspected the work of repairing the sudden breakage in the main water line with a diameter of 1000 mm on Rabei Al-Jizi Street in front of Umm Al-Masryeen Hospital. Immediately after receiving the report, he moved to the site of the breakage to follow up on the situation in the field and check on the progress of the repair work.
The Governor directed the officials of the Drinking Water and Sanitation Company to quickly deal with the breakage, raise the level of preparedness, and deploy all necessary equipment and technical teams, stressing the necessity of continuous work around the clock to complete repairs and re-pump water to the affected areas as quickly as possible. Time.
- For more: Follow Khaleejion 24 Arabic, Khaleejion 24 English, Khaleejion 24 Live, and for social media follow us on Facebook and Related




